The answer would be D, because you do 4200÷56=75 minutes. 75 minutes= 1 hour and 15 minutes
Answer:
635.25 is a week
Step-by-step explanation:
Answer:
point b is at 5,-3
you have to go 5 past and .5 up
Answer:
3 or (3,0)
Step-by-step explanation:
Use the slope formula (y2-y1)/(x2-x1)
(0+9)/(4+7)=9/11
Since q is parallel to r the slope will be the same. 9/11 is the slope of line r