Answer:
2.4 hours
Step-by-step explanation:
Let total work = X
Rate of work done = X ÷ time
Rate of A = X/4
Rate of B = X/6
If they work together, rate is the sum of their individual rates, i.e.
X/4 + X/6
= (3X + 2X)/12 (taking LCM)
=5X/12
Rate = X/time
5X/12 = X/time
time = X÷(5X/12)
time = X × 12/(5X)
time = 2.4 hours
Shortcut:
Product of individual times/sum of individual times
= (4×6)/(4+6)
=24/10
=2.4 hours
Answer:
1.65 per kg
Step-by-step explanation:
So the answer would be16*4=64
I used Excel to create the tables and the graphs.
I attached both the tables and the graphs.
You should replace the numbers of the x-axis (in both graphs) by the numbers as a fraction of pi. Those numbers are also included in the table, so you should not have problems with that.
Open and see tha file attached with the answer to your question..