Answer:
its 43
Step-by-step explanation:
as x was 1 in the first problem
you add X (1) by 42 and get
43..
sorry if thats wrong.
Answer:
d. Taking larger samples more frequently
Step-by-step explanation:
The alternative that will increase the probability of detecting a shift in the process average is option D.
d. Taking larger samples more frequently
.
Answer:
500.61
Step-by-step explanation:
5 multiplied by 100 = 500
1/10 = 0.1, So 6 multiplied by 0.1 = 0.6
1/100 = 0.01, So 1 multiplied by 1 = 0.01
500 + 0.6 + 0.01 = 500.61
Answer: 3/5
Step-by-step explanation:6/10 6 divide by 2 and 10 divide by 2
hoped this helped:)