Answer:
4.428 hours
Step-by-step explanation:
If the learning rate is 0.81, the slope of the learning curve is:

The time it takes to produce the n-th unit is:

If T1 = 8 hours, the time required to produce the seventh unit will be:

It will take roughly 4.428 hours.
No as it doesn’t go vertically through 1/3 on x axis
<span>a. A two-dimensional figure</span>
Answer:
See below.
Step-by-step explanation:
81/(14-5)*2
81/9*2
9*2
18
-hope it helps
In this case, the numbers would be 5*7 and 4*7 which is 35 and 28 respectively