Answer:
10L
Step-by-step explanation:
Answer:
1,140,000,000
Step-by-step explanation:
Answer:
It takes 70 minutes for 9 team members (painting 60 sq ft per minute) to paint a 4200 sq ft wall.
Step-by-step explanation:
4800 ÷ 20 = 240 sq ft per team member in 36 minutes
240 ÷ 36 = 6.67 sq ft per team member in 1 minute
6.67 × 9 = 60 sq ft per 9 team members in 1 minute
4200 ÷ 60 = 70 minutes (or 1 hour and 10 minutes)
The second one they do not have to pass trough (0,0)
Answer:
The steps to construct a a line parallel to another line from a point includes
1) From the given line draw a transversal through the point
2) With the compass, copy the angle formed between the transversal and the given line to the point P
3) Draw a line through the intersection of the arcs of the angle construction to get the parallel line through the point P
Step-by-step explanation: