1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Stolb23 [73]
3 years ago
15

What is this hurry please will give brainluest

Mathematics
1 answer:
aleksandr82 [10.1K]3 years ago
3 0

Answer:

450cm²

Step-by-step explanation:

The area of the kite is made up of two pairs of congruent triangles. Find the area of these and add to get the kite's area. (area of triangle = (1/2)(base)height))

2(0.5*15*20)+2(0.5*15*10)

300+150

450

You might be interested in
Can anyone help ? I need to answer it for my homework today
Rus_ich [418]
Robot 1- W = 20(3m) W= 60Nm
Robot 2- W= 30N (3m), W = 90Nm
Robot 3- W= 10N(2m), W= 20Nm
Robot 4- W= 30N(2m), W= 60Nm

Robot 2 did the most work, Robot 3 did the least amount of work and Robots, 1 and 4 did an equal amount of work
5 0
4 years ago
If 95 is added to a number, the result is 37 less than three times the number. Find the number.
mojhsa [17]
95+x=3x-37
132=2x
66=x
6 0
3 years ago
How do I complete this question on arc length?
tresset_1 [31]

Answer:

v ≈ 8.5 km/h

Step-by-step explanation:

Since the diameter of the wheel is 3 m the radius will be r = 1.5 m.

Use the radius of the water wheel to find it's circumference C:

C=2\pi r                                               [set r = 1.5 m]

⇒ C=2\pi (1.5)

⇒ C=3\pi m

One revolution of the water wheel corresponds to 3\pi meters so the angular velocity 15 rmp (revolutions per minute) corresponds to:

15(3\pi ) = 45\pi m/min

Using this result, the speed of the river in kilometers per hour will be:

v=\frac{45\pi m }{1 min} ×  \frac{1 km}{1000 m} × \frac{60 min}{1 h}

⇒ v=8.48230016469  km/h

⇒ v ≈ 8.5 km/h

5 0
3 years ago
Read 2 more answers
Job costing 1680000 to manufacture according to their job cost sheet were completed during the year pass the journal entry
sveticcg [70]

Answer:

Date               Account Title                                             Debit              Credit

XX-XX-XX      Finished Goods                                       $1,680,000

                      Work in Process                                                             $1,680,000

The good would be transferred at cost to the Finished goods account which would be debited to show its increase.

Work in Process will be credited to show that the job is being taken from it.

5 0
3 years ago
Which number satisfies the inequality 12n &lt; 3n + 28?<br> A.) 3<br> B.) 4<br> C.) 5<br> D.) 6
Dafna11 [192]
Let's move the terms with n to one side:
12n < 3n + 28 => 12n - 3n < 28
9n < 28 => n < 28/9
n < 3.1111
The only answer which satisfies this inequality is A.
5 0
3 years ago
Other questions:
  • Consider H0: μ = 45 versus H1: μ &lt; 45. A random sample of 25 observations produced a sample mean of 41.8. Using α = .025 and
    13·1 answer
  • 19, find the direction angle of vector v to the nearest tenth of a degree
    6·1 answer
  • Factor 50 into a product of its prime
    7·1 answer
  • It's hard to determine if the bank's web site is secure. <br> true or false?
    10·2 answers
  • What is the first step in solving the equation 2a – 4 (a – 5) = 10?
    5·1 answer
  • Find the area of a parallelogram if a base and corresponding altitude have the indicated lengths.
    13·1 answer
  • The volume in cubic centimeters of a sphere whose diameter is 6 centimes is ?
    7·1 answer
  • Lol but how do i do this??
    15·2 answers
  • Which one for number 1?????
    5·1 answer
  • PLSSS HELP ME PLSSS<br> 14 POINTS!<br> CAN'T YOU HELP ME THE BEAUTIFUL GIRL???!!!
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!