1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
yan [13]
3 years ago
11

Divide 7/24 by 35/48 and reduced the quotient the the lowest fraction.

Mathematics
2 answers:
Nataly [62]3 years ago
6 0
C. 4/10 is the correct answer
Hunter-Best [27]3 years ago
5 0

Answer: C. 4/10

I used calculator

You might be interested in
Using the letter x for any unknown number. i think of a number i add one and then double it
ivann1987 [24]

Answer:

2(x+1) or 2x+2

5 0
3 years ago
How do you multiply mixed numbers?
GalinKa [24]
1. You turn all mixed numbers into improper fractions
2. Multiply the numerators
3. Multiply the denominator’s
4. Reduce the final answer and convert back to mixed numbers if needed
5 0
4 years ago
Read 2 more answers
How are the 4 areas of a coordinated grid label ?
STatiana [176]
Hope this helps and if you need help I can help you

3 0
3 years ago
a computer expert can do a job on the computer in 6 hours. His secretary can do the same job in 7 hours. After the expert works
konstantin123 [22]

Answer:

4 + 2/3 hours

Step-by-step explanation:

For the expert,

6 hours = 1 job

For the secretary,

7 hours = 1 job

We want to figure out how much the expert gets done in 2 hours.

2 hours = x jobs for the expert.

To turn 6 hours = 1 job into this, we can multiply both sides of the equation by 2 (the number we want to get to) / 6 (the number we are at) to get

6 hours * 2/6 = 1 job * 2/6

2 hours = 2/6 jobs

Therefore, the expert does 2/6 of the job, and 1-2/6 = 4/6 of the job is left for the secretary. We want to figure out how long it takes for her to complete the job

We know

7 hours = 1 job

and want to figure out

y hours = 4/6 jobs

We can multiply both sides of the original equation by (4/7) (the number we want to get to) / 1 (the number we are at) to get

7 hours * 4/6 = 1 job * 4/6

28 /6 hours = 4/6 jobs

= 4 + 4/6 hours

= 4 + 2/3 hours

8 0
3 years ago
The spread around a regression modle is measured with the residual standard deviation. True or False
Anna11 [10]

Answer:

True

Step-by-step explanation:

Residual standard deviation is the square root of the residual variance. It is an estimate of the error made on the measurement of the dependent variable.

Thus, the spread around the regression model is usually measured with the residual standard deviation because it is the measurement of standard error between actual and predicted value.

3 0
3 years ago
Other questions:
  • HELP ASAP
    12·1 answer
  • The radius of an orange is 1.5 inches.
    5·1 answer
  • Question Help
    7·1 answer
  • Write 16 2/3% as a common fraction
    6·2 answers
  • Formula to find the missing number Faces:15 vertices:15 edges:?
    10·1 answer
  • Write the decimal equivalent for 7 and one third
    6·1 answer
  • Which is bigger 4/5 or 9/10
    6·2 answers
  • Please help and please hurry
    7·1 answer
  • Solve the system of equations. X-3y=-6<br> 2 = y + 3 <br> X <br> = <br> y <br> =
    13·1 answer
  • Area of trapezoid b1=5 b2= 7 h= 4
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!