I'm pretty sure you would do 6.5 times 3 and that would give you 19.5
Answer:
T = 3.5 hours
Step-by-step explanation:
this is a rate problem.
an experienced surveyor takes 7 hours to survey a roadbed
an apprentice surveyor takes 9 hours to survey a roadbed
the rate of the experienced surveyor =
the rate of the apprentice surveyor = 
if the two work together , 
T = 
T = 3.5 hours
Answer:
1.75a-11 (or) 1 3/4a-11
Step-by-step explanation:
3.75a-12-2a+1=
1.75a-11
(2,-1)(5,-10)
slope = (-10 - (-1) / (5 - 2) = -9/3 = -3
y = mx + b
slope(m) = -3
use either of ur points....(2,-1)...x = 2 and y = -1
now we sub and find b, the y int
-1 = -3(2) + b
-1 = -6 + b
-1 + 6 = b
5 = b
so ur equation is : y = -3x + 5 <==