Answer:
On-site food services is the INDEPENDENT variable and the weight gain is the DEPENDENT variable
Explanation:
Variables can be dependent or independent. An independent variable is the one used by the researcher to test its degree of influence on the dependent variable. The dependent variable, as the name implies, relies on changes in the independent variable to effect its own changes.
In the question, it is obvious that weight gain among the first year students is dependent on on-site food services
Please provide the language you're using when you ask for programming help, otherwise you aren't going to get the answer that you are looking for.
Here it is in Java, and I'm assuming the number is given via user input? Otherwise, just remove the user input function and replace the integer with a value of your choice. Note, that this isn't the full code; only what is relevant to the question.
public static void main(String[] args) {
int num = numInput(10);
printDoubles(num, 100); // You can create a user input function for
// maxValue if you wanted to.
}
/**
* Receives user input between 0 and the absolute value of maxInput.
* @param maxInput The largest absolute value that can be input.
*/
private static int numInput(int maxInput) {
Scanner sc = new Scanner(System.in);
maxInput = Math.abs(maxInput);
int num = 0;
while (!(num > 0 && num <= maxInput)) {
num = sc.nextInt();
if (!(num > 0 && num <= maxInput)) {
System.out.println("Input too small or too large");
}
}
return num;
}
/**
* Continues to print out num doubled until maxValue is reached.
* @param num The number to be printed.
* @param maxValue The maximum value (not including in which num can be doubled to.
*/
private static void printDoubles(int num, int maxValue) {
if (num >= maxValue) {
System.out.println("No output.");
}
while (true) {
if (num >= maxValue) {
break;
}
if (num < maxValue) {
System.out.print(num + " ");
}
num *= 2;
}
System.out.println();
}
answer to the google
i didn't knew it but i need points
<span>When it comes to linear programming, the solution which would be effective in satisfying all constraints in the given program in a simultaneous matter is called that of feasible programming. This is due to the fact that the program can satisfy all requirements at the same time.</span>