Answer:
-459
Step-by-step explanation in image
Answer:
72 parts
Steps:
Convert the 4 hours into minutes. There are 60 minutes in an hour. Therefore, 4 hours = 240 minutes.
Divide 240 minutes by 40 minutes. This equals 6. Therefore, the machinist can produce the 12 parts 6 times in 4 hours.
Finally, multiply the 12 parts by the 6 times he can produce. Therefore, the machinist can produce 72 parts in 4 hours.
Answer:
B) The null hypothesis cannot be rejected since the test statistic is approximately t = .29,which is not in the rejection region.
Step-by-step explanation:
to calculate mean
14.25+ 13.7 +14.02
+14.13+ 13.99 +14.04
= 84.13/6
= 14.02167
average = 14
s = 0.1837
test statistics t:
(bar(x)-mu)/(s/√n)
= 14.02167-14/0.1837/√6
0.02167/0.1837/2.4495
= 0.02167/0.07499
=0.28897
this is approximately 0.29
<u>therefore B) The null hypothesis cannot be rejected since the test statistic is approximately t = .29,which is not in the rejection region.</u>
<u></u>
Answer:
3.26$
Step-by-step explanation:
Simply subtract one from another to find the difference in the cost.