Let x = software program
Let y = video game
x < 200 ; y < 300
x + y < 425
50x ; 35y
x = 200 ; y = 225
50(200) + 35(225) = 10,000 + 7,875 = 17,875
x = 125 ; y = 300
50(125) + 35(300) = 6,250 + 10,500 = 16,750
x = 175 ; y = 250
50(175) + 35(250) = 8,750 + 8,750 = 17,500
It is more profitable to maximize production of software program when working within the limits provided.
The answer is 5 3/4.............
Answer:
The new length of the garden is 80 ft, the new width is 40 ft, and the total area of the new garden is 3200 ft². The area of the new garden will be 8 times larger than the current one. Jane should make her garden 4 times the current length.
Step-by-step explanation:
Juan's garden is 40 ft in length, he wishes to make the length 2 times longer:

Juan's garden is 10 ft in width, he wishes to make the width 4 times longer:

With a length of 80 and width of 40, the total area of the garden is

Since Juan wanted to make the length 2 times longer and the width 4 times longer, the total area of the garden will be

larger than the current garden.
Jane wants to make her garden 20 times the size. Since she's making her garden 5 times longer in width, she needs to make the length of her garden

4 times longer.
20/10 is same as 20:10 so the whole number is 2
Answer:450 cm
Step-by-step explanation: