1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Zarrin [17]
3 years ago
11

Write an equation of the line that passes through (-1,4) and is perpendicular to the line shown.

Mathematics
1 answer:
tatuchka [14]3 years ago
5 0

Answer:

<h3>  y= -3/4x - 4</h3>

Step-by-step explanation:

To write an equation that is perpendicular to a given line, take the negative reciprocal of the given slope. the given slope is 4/3, so the negative reciprocal is -3/4.

Using slope-intercept form of a linear equation, y=mx+b substitute in -3/4 for "m" the slope.

y=-3/4x+b

Now you need to "b" the y-intercept using the given point (-4,-1). Substitute the values in the equation. -1=-3/4(-4)+b simplify

                           -1= 3 + b    subtract 3 for both sides

                           -4=b

         substitue -4 for b.   Now you have    y= -3/4x - 4    this is your answer.

You might be interested in
The large rectangle was reduced to create the small rectangle.
Tema [17]

Answer:

The ratio must be guaranteed.

Therefore,

18/6 =12/x

=> x= 6*12/18 = 4

7 0
3 years ago
Which of these expressions is equivalent to log (20 27)
maria [59]
If the problem is referring to the equivalent logarithmic equation log (20 *27).
We can easily find and solve its equivalent expression using one of the many identities available in logarithmic. 
We can have the expression:
log (20*27) = log 20 + log 27

8 0
3 years ago
Problem 7.43 A chemical plant superintendent orders a process readjustment (namely shutdown and setting change) whenever the pH
vaieri [72.5K]

Complete Question

Problem 7.43

   A chemical plant superintendent orders a process readjustment (namely shutdown and setting change) whenever the pH of the final product falls below 6.92 or above 7.08. The sample pH is normally distributed with unknown mu and standard deviation 0.08. Determine the probability:

(a)

of readjusting (that is, the probability that the measurement is not in the acceptable region) when the process is operating as intended and \mu = 7.0 probability

(b)

of readjusting (that is, the probability that the measurement is not in the acceptable region) when the process is slightly off target, namely the mean pH is \mu = 7.02

Answer:

a

The value is  P(X < 6.92 or X > 7.08 ) =  0.26431  

b

The value  is P(X < 6.92 or X > 7.08 ) =  0.29344  

Step-by-step explanation:

From the question we are told that

  The mean is  \mu =  7.0

  The standard deviation is  \sigma  =  0.08

Considering question a

Generally the probability of readjusting when the process is operating as intended and mu  7.0 is mathematically represented as

       P(X < 6.92 or X > 7.08 ) =  P(X <  6.92  ) + P(X > 7.08)

=>    P(X < 6.92 or X > 7.08 ) =  P(\frac{X - \mu }{\sigma} < \frac{6.9 - 7}{0.08}  ) + P(\frac{X - \mu}{\sigma} >  \frac{7.08 - 7}{0.08} )

Generally

 \frac{X - \mu }{\sigma} = Z(The \  standardized \  value \ of \  X)

So

=> P(X < 6.92 or X > 7.08 ) =  P(Z < \frac{6.9 - 7}{0.08}  ) + P(Z >  \frac{7.08 - 7}{0.08} )    

=> P(X < 6.92 or X > 7.08 ) =  P(Z < -1.25) + P(Z >  1 )  

From the z table the probability of  (Z < -1.25) and  (Z >  1 ) is  

       P(Z < -1.25) =  0.10565

and

      P(Z >  1 ) = 0.15866

So

=> P(X < 6.92 or X > 7.08 ) =  0.10565 + 0.15866      

=> P(X < 6.92 or X > 7.08 ) =  0.26431      

Considering question b

Generally the probability of readjusting when the process is operating as intended and mu  7.02 is mathematically represented as

       P(X < 6.92 or X > 7.08 ) =  P(X <  6.92  ) + P(X > 7.08)

=>    P(X < 6.92 or X > 7.08 ) =  P(\frac{X - \mu }{\sigma} < \frac{6.9 - 7.02}{0.08}  ) + P(\frac{X - \mu}{\sigma} >  \frac{7.08 - 7.02}{0.08} )

Generally

 \frac{X - \mu }{\sigma} = Z(The \  standardized \  value \ of \  X)

So

=> P(X < 6.92 or X > 7.08 ) =  P(Z < \frac{6.9 - 7.02}{0.08}  ) + P(Z >  \frac{7.08 - 7.02}{0.08} )    

=> P(X < 6.92 or X > 7.08 ) =  P(Z < -1.5) + P(Z >  0.75 )  

From the z table the probability of  (Z < -1.5) and  (Z >  0.75 ) is  

       P(Z < -1.5) = 0.066807

and

      P(Z >  0.75 ) = 0.22663

So

=> P(X < 6.92 or X > 7.08 ) = 0.066807 + 0.22663      

=> P(X < 6.92 or X > 7.08 ) =  0.29344      

6 0
3 years ago
The length of a rectangle is 5 m more than twice the width of the rectangle . Length = Width =​
Arturiano [62]

Answer:

42

Step-by-step explanation:

L=2W+5

LW=42

(2W+5)W=42

2W^2+5W-42=0

(2W-7)(W+6)=0

2W-7=0

2W=7

W=3.5 ANS.

L=2*3.5+5=7+5=12 ANS.

PROOF:

3.5*12=42

42=42

4 0
3 years ago
Is the square root of 81 9?I think it is.
TEA [102]
Yes, because 9*9 is 81
5 0
3 years ago
Other questions:
  • A rectangle with width of 4. There is a vertical line that splits rectangle into two sections with different lengths. One length
    13·1 answer
  • graph the following systems of equations. which system has no solution? y equals negative x squared, y equals negative 4x minus
    15·1 answer
  • Jason has 34 blueberry scones and 85 blackberry scones. He wants to make as many identical bags of scones as possible. Each bag
    14·1 answer
  • At the start of the week, you could run for 8 minutes. By the end of the week, you could run for 15 minutes. Which proportion co
    13·2 answers
  • SOMEONE ANSWER PLEASE!!!!!
    9·2 answers
  • Describe fully the single transformation that maps a onto shape b
    12·2 answers
  • Find the slope of the line shown on the graph.
    12·1 answer
  • The sides of a triangle measure 2x + 5, X – 4, and
    13·2 answers
  • 7. The scatterplot shows the relationship between the number of minutes a person works out and the how many
    13·1 answer
  • Yesterday, Jennifer walked several laps around a track. She made Graph 1 to describe the relationship between time and distance.
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!