1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Mrrafil [7]
3 years ago
9

A worker takes a random sample of 290 bolts and finds that 29 of them are either too long or too short, thus making them unusabl

e. Estimate the number of unusable bolts in a production of 20,000 bolts.
Mathematics
2 answers:
Airida [17]3 years ago
6 0
29/290 = 0.1
0.1 * 20,000 = 2,000
There will be 2,000 unusable bolts. I hope this helps :)
yanalaym [24]3 years ago
3 0
I think 2,000 because for every 10 bolts one of them is going to be unusable and 20,000 divided by 10 is 2,000
You might be interested in
Five people buy individual insurance policies. According to the research, the probability of each of these people not filing a c
Arlecino [84]
P(no claim after 5 years) = (2/3)^5 =  0.132
3 0
3 years ago
Read 2 more answers
46.059 and 46.23 which is the faster time
snow_lady [41]
46.059 is the faster time because it is a smaller number than 46.23 by 0.171
4 0
3 years ago
Read 2 more answers
Two students created a list of steps for the following construction. Which student has steps in the correct order, and which doe
snow_tiger [21]

The student with the correct list of steps is student B

<h3>How to determine the correct student?</h3>

The list of steps is to create a line parallel to line AB

Both students are correct in step (1).

However, the step (2) of student A is incorrect.

This is so because, the student did not provide how points C and G are created

Hence, the student with the correct list of steps is student B


Read more about construction at:

brainly.com/question/19449402

#SPJ1

7 0
1 year ago
PLEASE HELP ME ASAP
bearhunter [10]

The series is a convergence series and the sum of the series is -8/3

<h3>The type of the series</h3>

The series is given as:

\sum\limits^{\infty}_{n = 1} -4(-\frac 12)^{n-1}

The above series has the following properties:

  • First term; a = -4
  • Common ratio, r = -1/2

Start by calculating the absolute value of the common ratio

Absolute value = |-1/2|

This gives

Absolute value = 1/2

The above value is less than 1.

It means that the series converges.

<h3>The sum of the series</h3>

This is calculated using:

S_{\infty} = \frac{a}{1 -r}

So, we have:

S_{\infty} = \frac{-4}{1 + \frac 12}

Evaluate the sum

S_{\infty} = \frac{-4}{\frac 32}

Evaluate the quotient

S_{\infty} = \frac{-8}{3}

Hence, the sum of the series is -8/3

Read more about geometric series at:

brainly.com/question/24643676

#SPJ1

5 0
2 years ago
Can anyone help with this? Geo question.
defon

Your answer would be B. This doesn't have four right angles.. nor are you trying to make a square/rectangle.

Hope this helps.

7 0
3 years ago
Other questions:
  • Answer please!!!! :)
    7·1 answer
  • What is the area of the parallelogram?
    8·1 answer
  • You have a bowl filled with 100 balls, which are colored red or blue. you have 50 red and 50 blue balls. you randomly select a b
    14·1 answer
  • Please find the missing side of the triangle and round the answer to the nearest tenth. Thanks.
    10·1 answer
  • One step equations word problems. I ONLY NEED 3-8!!!!
    5·1 answer
  • Taxicab Ride
    11·1 answer
  • On Monday, there were 18 chickens and 12 sheeps in a field. there were no other animals in the field. what was the ratio of chic
    13·2 answers
  • Porportion equation and solution: a punch recipe calls for 3 liters of ginger ale and 1.5 liters of tropical fruit juice how man
    9·1 answer
  • Ol-
    10·1 answer
  • Point P(1,7) is located on circle C. The center of circle C is (−2,3). What is the radius of the circle?
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!