Answer: 41.6%
Step-by-step explanation:
You divide the amount of trees 40ft or taller (10) by the total number of trees (24) so 10/24 = .416 (41.6%)
Answer:
Results are below.
Step-by-step explanation:
<u>First, we need to calculate the variable income per job:</u>
<u />
First job= 450 - 150= 300
Second job= 675 - 150= 525
<u>Now, the hourly rate:</u>
<u></u>
Hourly rate= total variable income / number of hours
First job= 300 / 4= $75
Second job= 525 / 3= $175
It is probably that the second job was 7 hours long. If not, he doesn't charge the same amount per hour
Out of 3 coins, if you are given that 1 is on tails, then the most heads you could have is 3 coins - 1 tails = 2 heads.
The probability of getting 3 heads would be 0.