Information to develop a project network is collected from the work breakdown structure
<h3>
Work breakdown structure </h3>
Work breakdown structure (WBS) is a structure showing the steps needed to be taken so as to complete a project.
WBS is presented in visual format and it is usually arranged based on hierarchy.
Information to develop a project network is collected from the work breakdown structure
Find out more on Work breakdown structure at: brainly.com/question/6197566
Answer:
var itemDescription = ["1975 Green Bay Packers Football (signed), Item 10582", "Tom Landry 1955 Football Card (unsigned), Item 23015", "1916 Army-Navy Game, Framed Photo (signed), Item 41807", "Protective Card Sheets, Item 10041"];
Explanation:
The following solution will work with javascript. Here we've stored different items in a variable named itemDescription.
The user needs to complete the entire disk surface first before starting another surface.
Explanation:
When you are using a multiple disk storage system to write the data the disk automatically writes the disk based on the algorithm for better efficiency and availability of the disk space.
hence when you are recording a data on a multiple disk storage system, it is recommended to fill the complete disk surface initially before you start the another surface to record the data.
Answer:
Rights and Responsibilities
Explanation: