<em>My goodness, this is rather confusing in the way it is worded. Nevertheless, I will attempt to do what I can. Just please keep in mind that this is my own interpretation of the problem, and therefore could be... incorrect.</em>
<em>I think, to start out, we could set up the problem like so</em>
<em>15 + t ≥ 26</em>
<em>because t is not a set number. </em>
<em>Then all that is needed is to subtract 15 from both sides, and the equation becomes</em>
<em>t ≥ 11</em>
<em>So the resulting answer is t ≥ 11.</em>
<em />
<em>I hope that my interpretation helps.</em>
<em>-Toremi</em>
<em />
Answer: No unless the fbi cathches up to you mr.gieco
Step-by-step explanation:
Answer:
$440,000
Step-by-step explanation:
Direct material:
= $195,000 - $30,000
= $165,000
Direct labor:
= $150,000 - $40,000
= $110,000
Manufacturing overhead:
150% of direct labor cost.
= $110,000 x 150 ÷ 100
= $16,500,000 ÷ 100
= $165,000
Total manufacturing costs:
= $165,000 + $110,000 + $165,000
= $275,000 + $165,000
= $440,000
The total manufacturing costs added during the period is: <u>$440,000</u>
Answer:
210
Step-by-step explanation:
GCF(30,42) = 6
LCM(30,42) = ( 30 × 42) / 6
LCM(30,42) = 1260 / 6
LCM(30,42) = 210