Cost per meter(C) = $60/m
Length of rectangular field(L) = 50m
L = 2W
-> W = L/2
-> W = 50/2
-> Width of rectangular field = 25m
Cost of one field length(l) = L x C
-> l = 50 x 60
-> l = $3000
Two of the lengths of the field = 2 x l
-> 2 x $3000
-> $6000
Cost of one field width(w) = W x C
-> w = 25 x 60
-> w = $1500
Two of the widths of the field = 2 x w
-> 2 x $1500
-> $3000
Cost of fencing entire field = $6000+$3000
Hence, total field cost = $9000
530.59
take the surface area of the cylinder (358.14)
and add it with the surface area of the cone(172.45)
Answer:
9
Step-by-step explanation:

Use the correct order of operations, PEMDAS.



Answer: 3.83
Step-by-step explanation:
(2.24)(1.71)
=3.83
I think you just simply solve it
Answer: 2.592 x 10^6 seconds
Explanation:
There are 3600s in 1 hr
And 24hrs in 1 day which mean
There are 3600 x 24 = 86400s in 1 day
And one month = 30 days
86400 x 30 = 2, 592, 000s in 1 month
Write in scientific notation:
2, 592, 000 = 2.592 x 10^6