Answer:
The answer is below
Step-by-step explanation:
a) For a normal model the sample size has to be equal or greater than 30 so that it can be a normal distribution.
b) Given that:
μ = 11.2 minutes, σ = 4.8 minutes, n = 45
The z score determines how many standard deviations the raw score is above or below the mean. It is given by:

For x < 10 minutes

Therefore from the normal distribution table, P(x < 10) = P(z < -1.68) = 0.0465
Answer:
27; C; B; D
Step-by-step explanation:
1. B = 120 degrees, and C = 60 degrees. Q = 90 degrees, because B + C = 180 degrees, and the triangle BQC has angle B and angle C bisected. If B = 120 degrees, then the height is equal to 9 sqrt 3, which makes BC equal to 27.
2.C
3. B (You don't actually know if any of the sides are parallel.)
4. D
We have: 5m 75cm = 5.75 m
So the length of each piece is : 
ok done. Thank to me :>
1 hm=100m
1.5hm=150 meters each tower is from each other.
500km(1000m/1km)=500,000 meters the wire covers.
500,000/150 = 3333.33 towers. Just because we want to be safe and have enough towers we can say we have 3334 towers in the span of 500,000 meters.
B)
1kV=1000V
500kV(1000V/1kV)= 500,000 V
There are 1.2 volts in a AA battery so we divide 500,000/1.2 = 416666.67 times larger
If you are asking if your work is good,thn yes,you are right