Answer: a) 84 and b ) 2084
Step-by-step explanation:
Given : Sample standard deviation : s= $22.82
(Population standard deviation is unknown ) , so we use t-test.
Critical value or the 95% confidence intervals :
Formula to find the sample size :

a) E = 5


i.e. Required sample size : n= 84
b) E = 1


i.e. Required sample size : n= 2084
Answer:
0.9355
Step-by-step explanation:
What we will use here is conditional probability formula.
let A be the event that the plane departs on time
and B be the event that it arrives on time
P(A) = 0.87
P(B|A) = 0.93
P(B) = ?
P(A n B) = ?
Mathematically;
P(B|A) = P(B nA)/P(A)
0.93 = 0.87/P(A)
P(A) = 0.87/0.93
P(A) = 0.935483870967742
which is 0.9355 to four decimal places
Answer:
34 is it
Step-by-step explanation:
If it's just a vertical line, then it could be displayed as: x = 5.
A vertical line is not actually a function, and because of such, the entire line is just the value of the x value, as it will never have enough x value.
Answer:
<h2>12 </h2>
Step-by-step explanation:
<h2>2.5x = 30</h2><h2>x = 30 / 2.5</h2><h2>x = 12</h2>