Answer:
Should be a 33.33% increase
Step-by-step explanation:
320 divided by 240 to get 1.33, anything above 1 is increase, so its a 33% increase.
= -3
Divide everything by the "X" thing AND MOVE IT TO OPPOSITE SIDE
4 i think
cumulative frequency
1
8
25
45
58
62
we know that
The unit rate is $0.65 per foot
so
To find out the cost, multiply the unit rate by the length of the rope
0.65*(10.8)=$7.02
therefore