Answer:
d. The client has no adaptive coping mechanisms.
Explanation:
The reduction of anxiety felt by the clients is reduced by the Clients in either the functional ways or dysfunctional ways.
The first thing done by the nurse was to find out the techniques used by the client in past and help the client to enhance and identify those most beneficial strategies .The next step is done by the client and the nurse to find out the maladaptive strategies such as alcohol use,social withdrawal and swap them with adaptive strategies which are suitable for the client's cultural,personal and spiritual values.
The nurse should not suggest the client to give up coping mechanism without offering other mechanism even if the client is having the maladaptive strategies.
The main advantages of the d-step tuning of 2023 Murano's xtronic cvt is that:
- It gives room for the transmission to quickly change ratios in regards to quick acceleration.
- When at higher rpm, it help one to stepped acceleration via the use of linear acceleration feel.
<h3>What kind of transmission does a Nissan Murano have?</h3>
It is known to have a continuously variable automatic transmission (CVT) and it is one whose only engine is said to give about a 3.5-liter V-6 that helps to bring about a lot of power.
Note that the main advantages of the d-step tuning of 2023 Murano's xtronic cvt is that:
- It gives room for the transmission to quickly change ratios in regards to quick acceleration.
- When at higher rpm, it help one to stepped acceleration via the use of linear acceleration feel.
Learn more about cars from
brainly.com/question/25749514
#SPJ1
Formatting can maybe be applied to software works
Answer:
Bike Frame Flow Time
The value-added percentage of the flow time for this bike frame is:
= 46.
Explanation:
a) Data and Calculations:
Bike Frame Flow Time:
Setup time = 7 hours
Processing time = 6 hours
Storage time = 7 hours
Flow time of the bike frame = 13 hours (7 + 6)
Value-added percentage of the flow time for this bike frame = 6/13 * 100
= 46%
b) Flow time represents the amount of time a bicycle frame spends in the manufacturing process from setup to end. It is called the total processing time. Unless there is one path through the process, the flow time equals the length of the longest process path. The storage time is not included in the flow time since it is not a manufacturing process.