Advocard [28]
2 years ago
13

Budget Performance Reports for Cost Centers Partially completed budget performance reports for Delmar Company, a manufacturer of

light duty motors, follow:
Delmar Company
Budget Performance Report—Vice President, Production
For the Month Ended June 30
Plant Actual Budget Over Budget (Under) Budget
Eastern Region $4,200,000 $4,250,000 $(50,000)
Central Region 6,175,000 6,200,000 (25,000)
Western Region (g) (h) $(i)
$(j) $(k) $(l) $(75,000)
Delmar Company
Budget Performance Report—Manager, Western Region Plant
For the Month Ended June 30
Department Actual Budget Over Budget (Under) Budget
Chip Fabrication $(a) $(b) $(c)
Electronic Assembly 2,575,000 2,500,000 75,000
Final Assembly 1,640,000 1,700,000 $(60,000)
$(d) $(e) $(f) $(60,000)
Delmar Company
Budget Performance Report—Supervisor, Chip Fabrication
For the Month Ended June 30
Cost Actual Budget Over Budget (Under) Budget
Factory wages $1,450,000 $1,200,000 $250,000
Materials 1,575,000 1,600,000 $(25,000)
Power and light 945,000 900,000 45,000
Maintenance 330,000 300,000 30,000
$4,300,000 $4,000,000 $325,000 $(25,000)
a. Complete the budget performance reports by determining the correct amounts for the lettered spaces (a-l) as marked above.
b. Complete the following memo to Randi Wilkes, vice president of production for Delmar Company, explaining the performance of the production division for June.
Business
1 answer:
julia-pushkina [17]2 years ago
8 0

Answer:

Delmar Company

Delmar Company

Budget Performance Report—Vice President, Production

For the Month Ended June 30

Plant                       Actual           Budget      Over Budget   (Under) Budget

Eastern Region  $4,200,000   $4,250,000                           $(50,000)

Central Region      6,175,000     6,200,000                             (25,000)

Western Region    8,515,000     8,200,000    $375,000

                         $18,890,000  $18,650,000    $375,000      $(75,000)

Delmar Company

Budget Performance Report—Manager, Western Region Plant

For the Month Ended June 30

Department                  Actual       Budget     Over Budget   (Under) Budget

Chip Fabrication      $4,300,000   $4,000,000   $300,000

Electronic Assembly  2,575,000     2,500,000       75,000

Final Assembly           1,640,000      1,700,000                             $(60,000)

                                 $8,515,000  $8,200,000   $375,000         $(60,000)

b. Memo to Randi Wilkes, Vice President

To: Vice President, Production

From: FC

Subject: Budget Performance Report—For the Month Ended June 30

Date: July 3, 2021

The above-mentioned subject refers.

The production division incurred $315,000 more costs than budgeted.  The extra costs are reflected in the increasing cost of producing light duty motors in the Western Region.  The overall increase is caused by the regional differences in Chip fabrication and Electronic Assembly.

There is a need to review production activities with these two production processes with a view to reducing costs.

Regards,

Explanation:

a) Data and Calculations:

Delmar Company

Budget Performance Report—Vice President, Production

For the Month Ended June 30

Plant                       Actual           Budget      Over Budget   (Under) Budget

Eastern Region  $4,200,000   $4,250,000                           $(50,000)

Central Region      6,175,000     6,200,000                             (25,000)

Western Region     (g)                       (h)                $(i)

                             $(j)                      $(k)                $(l)             $(75,000)

Delmar Company

Budget Performance Report—Manager, Western Region Plant

For the Month Ended June 30

Department                  Actual      Budget     Over Budget   (Under) Budget

Chip Fabrication      $(a)                $(b)                $(c)

Electronic Assembly 2,575,000  2,500,000       75,000

Final Assembly          1,640,000   1,700,000                             $(60,000)

                                   $(d)               $(e)              $(f)                 $(60,000)

Delmar Company

Budget Performance Report—Supervisor, Chip Fabrication

For the Month Ended June 30

Cost                             Actual      Budget     Over Budget     (Under) Budget

Factory wages    $1,450,000  $1,200,000    $250,000

Materials               1,575,000     1,600,000                               $(25,000)

Power and light      945,000       900,000         45,000

Maintenance          330,000       300,000         30,000

                         $4,300,000  $4,000,000    $325,000          $(25,000)

a. = $4,300,000

b. = $4,000,000

c. = $300,000 ($325,000 - $25,000)

d. = $8,515,000 ($4,300,000 + 2,575,000 + 1,640,000)

e. = $8,200,000 ($4,000,000 + 2,500,000 + 1,700,000)

f. = $375,000 ($300,000 + 75,000)

g. = $8,515,000

h. = $8,200,000

i. = $375,000

j. = $18,890,000 ($4,200,000 + 6,175,000 + 8,515,000)

k. = $18,650,000 ($4,250,000 + 6,200,000 + 8,200,000)

l. = $375,000

You might be interested in
Problem 10A specialty coffeehouse sells Colombian coffee at a fairly steady rate of 280 pounds annually. The beans are purchased
SOVA2 [1]

Answer:

The computations are shown below:

Explanation:

a. The computation of the economic order quantity is shown below:

= \sqrt{\frac{2\times \text{Annual demand}\times \text{Ordering cost}}{\text{Carrying cost}}}

= \sqrt{\frac{2\times \text{280}\times \text{\$45}}{\text{\$0.48}}}

= 229 units

The carrying cost is come from

= $2.40 × 20%

b. Time between placement of orders is

= Economic order quantity ÷Annual demand

= 229 ÷ 280

= 0.8179 years

So,

= 0.8179 × 365 days

= 298.53 days

We assume 365 days in a year

c. The average annual cost of ordering cost and carrying cost equals to

= Holding cost + ordering cost

= (Economic order quantity ÷ 2 × Holding cost)  + (Annual demand ÷ Economic order quantity × ordering cost)

= (229 units ÷ 2 × $0.48) + (280 ÷ 229 units × $45)

= $54.96 + $55.02

= $109.98

d)   Now the reorder level is

= Demand × lead time + safety stock

where, Demand equal to

= Expected demand ÷ total number of weeks in a year

= 280 pounds ÷ 52 weeks

= 5.38461

So, the reorder point would be  

=  5.38461 × 3 + $0

= 16.15 pounds

7 0
3 years ago
In a shoe manufacturing plant, all shoes undergo the same operations in the same sequence. the shoes flow from one workstation t
andre [41]
The answer is product layout. In manufacturing engineering, this talk about to a manufacture system where the work locations and apparatus are situated beside the line of production, as with assemblage lines. Generally, work units are stirred along a line (not essentially a geometric line, but a set of consistent work stations) by a conveyor.
6 0
3 years ago
When Fisher-Price comes up with an idea for a new toy, it needs to ensure that the children who play with the toy will not choke
Dmitriy789 [7]

Answer:

The correct answer is Product Development Stage.

Explanation:

If any of the changes are required to be incorporated in a design, the best point of attempting these changes is in the product design phase such that the considerations are included from the initial stage and the design effort is not wasted.

6 0
3 years ago
Which of the following is broadly defined as the development of new products, processes, organizations, management practices, an
omeli [17]

<span>In development of new products, the most defined aspect is the processes.  It takes a great deal of effort and time in product creation in laboratories. Testing the feasibility of new product in actual manufacturing environment. Trials are done to capture and document actual procedures, machine specifications, safety requirement, and actual working parameters to achieve the desired specification of the new product. </span>

3 0
3 years ago
Pup tents use 4 direct labor hours (DLH) per unit and Pop-up tents use 3 direct labor hours per unit. Compute the overhead cost
lora16 [44]

a) The computation of the single plantwide predetermined overhead rate for Tent Master is $6 per DLH ($252,000/42,000).

b) The computation of the overhead cost per unit for Pup and Pop-up Tents for Tent Master is computed as follows:

                               Pup Tents     Pop-up Tents

Overhead cost     $24 ($6 x 4)    $18 ($6 x 3)

c) The computation of the product cost per unit for Pup and Pop-up Tents is as follows:

Per Unit      Selling     Direct     Direct  Overhead     Product

                    Price   Materials   Labor    per unit    Cost / Unit

Pup tent       $ 78         $ 20      $ 45        $24             $89

Pop-up tent    73             25         30         $18             $73

d) The computation of the gross profit per unit (selling price per unit minus the product cost per unit) of Pup and Pop-up Tents is as follows:

Per Unit      Selling     Direct    Direct  Overhead   Product    Gross Profit

                    Price   Materials  Labor    per unit   Cost / Unit  (Loss) per unit

Pup tent      $ 78       $ 20      $ 45         $24             $89     ($11) ($78 - $89)

Pop-up tent   73          25          30          $18             $73       $0 ($73 - $73)

<h3>What does a product cost?</h3>

The determination of the product cost includes the costs of direct materials, direct labor, and overhead.  The overhead cost is allocated to each unit based on a predetermined overhead rate (budgeted overheads/budgeted usage) or using an activity-based costing technique.

<h3>Data and Calculations:</h3>

Budgeted overhead costs = $252,000

Budgeted direct labor hours = 42,000

<h3>Question Completion:</h3>

Tent Master produces Pup tents and Pop-up tents. The company budgets $252,000 of overhead cost and 42,000 direct labor hours. Additional information follows:

Per Unit      Selling Price  Direct Materials  Direct Labor  DL Hours

Pup tent          $ 78                   $ 20                   $ 45            4

Pop-up tent       73                       25                      30            3

<h3>Required: </h3>

1. Compute a single plantwide overhead rate assuming the company allocates overhead costs based on 42,000 direct labor hours.

2. Pup tents use 4 direct labor hours (DLH) per unit and Pop-up tents use 3 direct labor hours per unit. Compute the overhead cost per unit for each product.

3. Compute the product cost per unit for each product.

4. For each product, compute the gross profit per unit (selling price per unit minus the product cost per unit).

Learn more about calculating the predetermined overhead rates at brainly.com/question/26372929

4 0
2 years ago
Other questions:
  • In ______, the organization is either trying to get people inside the company to apply for different job openings or to get outs
    9·1 answer
  • Gage buys from fishing guide corporation the exclusive right to sell fishing guide rods and reels in a certain area. their franc
    10·1 answer
  • RF Company had January 1 inventory of $150,000 when it adopted dollar-value LIFO. During the year, purchases were $900,000 and s
    15·1 answer
  • What is the difference between anomaly based monitoring and signature based monitoring?
    10·1 answer
  • How much land would each person have if we split the land?
    6·1 answer
  • Suppose a car manufacturer discovers that the marginal cost of the last car produced was $15,000, while the marginal revenue was
    6·1 answer
  • A firm must choose among three alternative ways to compensate its salaried employees. It can pay them at the end of each week, a
    11·1 answer
  • Which of the following phases of the accounting information processing cycle is performed at the end of the accounting period? A
    12·1 answer
  • I'm getting pretty desperate plz help me, I'll give brainiest, and ill make a free question worth 100 points this is for coding
    5·2 answers
  • Successfulness of the competition policy in South Africa
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!