The answer is 0.4%. The probability that a unit end in a rework can be calculated using the following equation:
P(rework)= P(defects found) * P(defect)
= .8 * .005
= .004
= 0.4%
Thank you for posting your question. Feel free to ask me more.
What is the mode for the data set? <br>
59,57,56,50,58,51,54,59,55,52,53 (multiple choice)
jok3333 [9.3K]
The mode for this is 59
Other stuff you may need:
<span><span>Range - 9
</span><span>Median - 55</span><span>
</span><span>Mean - 54.909</span></span>
Answer:
y=-3/16(x-8)^2+12
Step-by-step explanation:
Refer to the vertex form equation for a parabola:
y=a(x-h)^2+k where (h,k) is the vertex.
Therefore, we have y=a(x-8)^2+12 as our equation so far. If we plug in (16,0) we can find a:
0=a(16-8)^2+12
0=64a+12
-12=64a
-12/64=a
-3/16=a
Therefore, your final equation is y=-3/16(x-8)^2+12
Answer:
B
Step-by-step explanation:
if it is shaded under than it is <
the slope is 1/2x so that is the answer