We have that
<span>log10 E = 4.4 + 1.5<span>M
</span></span>E=<span>the released energy in Joules (J)
M= </span><span>earthquake measures---------- > 3.6
</span>log10 E = 4.4 + 1.5*3.6
log10 E = 9.8----------> E=10^(9.8)= 6.309573444 x10^9 J
<span>
the answer is </span>6.309573444 x10^9 J<span>
</span>
Answer:
y is greater than or equal to 14
Step-by-step explanation:
Answer:
6.7% of children who finished the race in under 45 seconds.
Step-by-step explanation:
We are given the following information in the question:
Mean, μ = 75 seconds
Standard Deviation, σ = 20 seconds
We are given that the distribution of time of completion is a bell shaped distribution that is a normal distribution.
Formula:
P(finished the race in under 45 seconds.)
P(x < 45)
Calculation the value from standard normal z table, we have,

6.7% of children who finished the race in under 45 seconds.
Hello!
So, the slope is 2, which means "up 2 over 1" because of rise over run and 2 is 2/1.
You have to find the graph that as a line passing through (-2, -3), so the answer is going to be Graph D.
Hope this helps :))
Answer:
x<-2
Step-by-step explanation:
Divide both sides of the inequality by 5 to solve for x.