Distribute 1/2 to <span>(n – 4):
</span>


<span>
Subtract (2n + 3):
</span>

<span>
Your equation should now look like this:
</span>

<span>
Combine like terms on both sides:
</span>



<span>
Subtract 1/2n from both sides:
</span>

<span>
Divide both sides by -5/2 to get n by itself:
</span>

<span>
The value of n is
2.</span>
Answer:
Hope this helps
Step-by-step explanation:
Area= 48
If a square= 6.928 by 6.928
If Circle = Radius :3.909
If rectangle = 12 by 4
Percent change = ((new value) - (old value))/(old value) × 100%
= (180 -135)/135 × 100%
= 33 1/3%
180 is about 33% greater than 135.
Answer: it will take the faster computer 15 minutes to do the job on its own.
Step-by-step explanation:
Let t represent the number of minutes it will take the faster computer to do the job on its own. It means that the rate at which it does the job per minute is 1/t
If it takes the slower computer 30 minutes to do the job on its own. It means that the rate at which it does the job on its own per minute is 1/30
By working together, they would work simultaneously and their individual rates are additive. Working together it takes two computers 10 minutes to send out a company's email. It means that the rate at which both computers work together per minute is 1/10 Therefore,
1/t + 1/30 = 1/10
Cross multiplying by 30x, it becomes
3x = x + 30
3x - x = 30
2x = 30
x = 30/2
x = 15 minutes
It has one solution that I know of