Answer:
(2, -39)
Step-by-step explanation:
f(x)=-3(x+2)^2+9
f(2)=-3(2+2)^2+9
f(2)=-3(4)^2+9
f(2)=-3(4)(4)+9
f(2)=-3(16)+9
f(2)=-48+9
f(2)=-39
Answer:
Quadrant 4
Step-by-step explanation:
Answer:
A. 83
Step-by-step explanation:
I hope this helps :)
The quotient of 3489 divided by 6 is 581.
Answer:
a) 40.13% probability that a laptop computer can be assembled at this plant in a period of time of less than 19.5 hours.
b) 34.13% probability that a laptop computer can be assembled at this plant in a period of time between 20 hours and 22 hours.
Step-by-step explanation:
When the distribution is normal, we use the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this question:

a)Less than 19.5 hours?
This is the pvalue of Z when X = 19.5. So



has a pvalue of 0.4013.
40.13% probability that a laptop computer can be assembled at this plant in a period of time of less than 19.5 hours.
b)Between 20 hours and 22 hours?
This is the pvalue of Z when X = 22 subtracted by the pvalue of Z when X = 20. So
X = 22



has a pvalue of 0.8413
X = 20



has a pvalue of 0.5
0.8413 - 0.5 = 0.3413
34.13% probability that a laptop computer can be assembled at this plant in a period of time between 20 hours and 22 hours.