1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Mrrafil [7]
3 years ago
6

Write a first degree function g(x) and a second degree function h(x).

Mathematics
1 answer:
gladu [14]3 years ago
3 0

Answer:

g(x) = 6x - 8

h(x) = 2x^2 + 4x - 5

Step-by-step explanation:

g(x) = 6x - 8

h(x) = 2x^2 + 4x - 5

You might be interested in
Simplify.<br> √20 <br> v<br> Assume that the variable represents a positive real number.
True [87]

Answer:

2\sqrt{5v}

Step-by-step explanation:

We can treat 20v as a regular number and not a term.

To simplify this square root, we need to break it down into parts which can be squared.

\sqrt{20v} = \sqrt{4\cdot5v}

Square root of 4 is 2, so that goes outside the radical.

2\sqrt{5v}.

Hope this helped!

3 0
4 years ago
Read 2 more answers
3 Which of the following points does not lie
Radda [10]
I’m pretty sure the answer is b but not 100%
8 0
3 years ago
Giovanni went to Los Angeles,California for the summer to visit his cousins.He used a map of bus routes to get from the airport
zepelin [54]
You must convert 56 to cm comment on that answer and will help from there
5 0
3 years ago
A building company used 24 workers to prepare a building site. The site measured 30 acres and the work was completed in 10 days.
maks197457 [2]

Answer:

30 workers are required.

Step-by-step explanation:

If the site measured 30 acres and was completed in 10 days, then it can be said that on average \frac{30}{10} = 3\frac{acres}{day} were made.

Then, 24 workers completed 3 acres / day.

Then, \frac{24.workers}{\frac{3acres}{day}} = \frac{8..Workers * days}{acre}

8 workers can complete 1 acre per day

Now to know how many workers are needed to complete 45 acres in 12 days, we multiply:

8\frac{Workers * days}{acre}*\frac{45}{12} \frac{acres}{days} = 30.workers.

Finally, 30 workers are required.

To solve this problem it was assumed that everyone worked at the same pace, which may not be true, the fact that some work at a slower or faster pace than another could alter the result, causing them to finish less or more acres by day.

6 0
3 years ago
21/7= ?/1 i don't know the answer please help
kenny6666 [7]

Answer:?=3

Step-by-step explanation:

all you do is basic division... :)

8 0
3 years ago
Read 2 more answers
Other questions:
  • Walter buys a bus pass for $30. Every time he rides the bus, money is deducted from the value of the pass he Road 12 times and $
    5·1 answer
  • Which of the following options have the same value as 25% of 64?
    8·1 answer
  • My number A is 24.
    5·2 answers
  • "If a method produces a random error for each measurement of 4%, but a percent error of equal to or less than 1% is required for
    14·1 answer
  • How do i put 5x^2+6+3xy^5-2x in standard form
    9·1 answer
  • What are the domain an range of the function on the graph ?
    6·1 answer
  • A tire manufacturer knows that 5% of tires contain a defect, and the presence of a defect is independent from tire to tire.
    10·2 answers
  • What is the result of converting 1260
    8·2 answers
  • X + 14 = 26, x = <br><br>I need help please​
    7·2 answers
  • What is NE? Enter your answer in the box
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!