Answer:
The plumber worked 50 hours, and his assistant worked 25 hours.
Step-by-step explanation:
Since a plumber and his assistant work together to replace the pipes in an old house, and the plumber charges $ 30 an hour for his own labor and $ 20 an hour for his assistant's labor, and the plumber works twice as long as his assistant on this job, and the labor charge on the final bill is $ 2000, to determine how long did the plumber and his assistant work on this job the following calculation must be performed:
40 x 30 + 20 x 20 = 1200 + 400 = 1600
50 x 30 + 25 x 20 = 1500 + 500 = 2000
Therefore, the plumber worked 50 hours, and his assistant worked 25 hours.
Your answer is going to be 26 and 14, because 26+14=40, and 26-14=12.:)
Answer:
tHANKS FOR THE POINT
]'
Step-by-step explanation:
Step-by-step explanation:
y — yı = m(x – xı) equation of a line
Points A(1,3) and B(2,1)
Slope (m) = (y2 – y1) / (x2 – x1)
(1 –3) / (2 – 1)
–2/1
–2
Thus, y –3 = –2 (x – 1)
y – 3 = –2x + 2
y –3 + 3 = –2x + 2 + 3
y = –2x + 5
Answer:
Step-by-step explanation:
hello :
|x – 5| + 2 < 20 means : |x – 5| + 2-2 < 20-2
|x – 5| < 18
-18< x - 5 < 18
-18+5< x - 5+5 < 18+5
-13< x< 23 ( solutions)