Answer:
x,y=-5,-6
Step-by-step explanation:
Answer:
340
Step-by-step explanation:
The first step is finding the percentage of those who fail within 19 months.
Problems of normally distributed samples can be solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

The proportion is the pvalue of Z when X = 19. So



has a pvalue of 0.6808.
Jolt is expected to replace 0.6808 of the connectors sold. Out of 500, that is, on average, 0.6808*500 = 340.
Jolt expects to replace, on average, 340 of the connectors sold.
3 11/12 is the answer. 47.02 equals 47/12 as a fraction if you divide 47 by 12 you will get 3 with a remainded of 11/12. Therefore, the mixed number is 3 11/12
Answer:
9x - 10y =75
Step-by-step explanation:
Answer:
x = 2 (For First question)
Step-by-step explanation:
8^ 1/6 * 2^x = 32^1/2
8^1/6 * 2^x 8^1/6 = 32^1/2/8^1/6
2^x = 32^1/2 / 8^1/6
2^x = 4
2^x = 2^2
x =2
Question 2:
Answer: 50
Step-by-step explanation:
8^1/3/5^-2
= 2/5^-2
= 2/1/5^2
= 2* 5^2/1
= 2 * 5^2
= 2 * 25
= 50