Answer:
30 inches
Step-by-step explanation:
Assuming the lengths are measured when B lies between A and C on a line, the segment addition theorem applies:
AC = AB +BC
42 = AB + 12 . . . . . fill in the given numbers
30 = AB . . . . . . . . . subtract 12
The length of AB is 30 inches.
Answer:
3rd option: x= 40
Step-by-step explanation:
4x° +20°= 180° (adj. ∠s on a str. line)
<em>Bringing</em><em> </em><em>constants</em><em> </em><em>to</em><em> </em><em>1</em><em> </em><em>side</em><em>:</em>
4x°= 180° -20°
<em>Simplify</em><em>:</em>
4x°= 160°
<em>Divide</em><em> </em><em>by</em><em> </em><em>4</em><em> </em><em>on</em><em> </em><em>both</em><em> </em><em>sides</em><em>:</em>
x°= 40°
Thus, x=40.
top left: speed = 2.7 miles per hour = 2.7 MPH
top right: speed = 0 miles per hour = 0 MPH
bottom left: speed = 4 miles per hour = 4 mi/h
bottom right: speed = 2 miles per hour = 2 mi/h
and so, the fastest is bottom left. And pay attention in class! i'm in highschool and Iearned this in 6th grade!
Step-by-step explanation:
key: speed= distance/time
distance= speedxtime
time=distance/speed
top left: 8/3= 2.66667 MPH= 2.7 MPH
top right: 0/8= 0 MPH= 0 MPH
bottom left: 8/2= 4 MPH= 4 MPH
bottom right: 8/4= 2 MPH= 2 MPH
To find the amount of work done, we need to use the formula for work.
The formula is: Force x Distance.
The force being given is 50N, and the distance traveled is 3M.
With this information, we're ready to solve!
Let's plug in our numbers to the formula given above.
Work = 50 x 3
50 x 3 = 150.
The amount of work done is 150J.
I hope this helps!
80/100 that is what it will be transferred to