<span><span>anonymous </span> 3 years ago</span>we are solving for A,
A is the future amount A=?
P is the present value, so we were told 7,900, so p=7900
r is the interest rate, so 4.3%, but in decimal form so r=0.043
k is the how often it is 'compounded', it says quarterly, so k=4
n is how long, 3 years, so n=3
<span>A=P(1+<span>rk</span><span>)<span>n∗k</span></span></span>
plug in the values
<span>A=8981.51</span>
Answer:
a: 1037 is the minimum sample size needed
b: 712 is the minimum sample size needed
Step-by-step explanation:
We need to use the formula for minimum sample size of a proportion when a sample proportion is known.
The level of confidence is 99%, which has a corresponding z-value of 2.575.
We know the desired error is 4%, or 0.04.
Part a: We have no prior estimate. See attached photo for calculation
Part b:
We know p-hat = 0.22. Therefore q-hat = 1 - 0.22 = 0.78
See the attached photo for the calculation of the minimum sample size
The answer to your question B. 40.
Answer:
1 ft per minute=0.000189 miles per minute
Step-by-step explanation:
Answer:
5.5 miles
Step-by-step explanation:
88 divided by 16 = 5.5