25 hope it helps (;......
Answer:
n = 66.564
Step-by-step explanation:
- Because the population is unknown, we will apply the following formula to find the sample size:

Where:
z = confidence level score.
S = standard deviation.
E = error range.
2. We will find each of these three data and replace them in the formula.
"z" theoretically is a value that measures how many standard deviations an element has to the mean. For each confidence level there is an associated z value. In the question, this level is 99%, which is equivalent to a z value of 2.58. To find this figure it is not necessary to follow any mathematical procedure, it is enough to make use of a z-score table, which shows the values for any confidence interval.
The standard deviation is already provided by the question, it is S = 100.
Finally, "E" is the acceptable limit of sampling error. In the example, we can find this data. Let us note that in the end it says that the director wishes to estimate the mean number of admissions to within 1 admission, this means that she is willing to tolerate a miscalculation of just 1 admission.
Once this data is identified, we replace in the formula:

3. The corresponding mathematical operations are developed:


n= 66.564
-4 1/5 is greater than -4 9/10
<h3>
Answer: perpendicular slope is -2/3</h3>
=================================================
Work Shown:
Solve the given equation for y
2y = 3x - 10
y = (3x-10)/2 ..... divide both sides by 2
y = (3x)/2 - 10/2
y = (3/2)x - 5
The equation is in y = mx+b form with m = 3/2 as the slope.
The perpendicular slope is -2/3 because we flip the fraction and the sign from positive to negative.
Note how multiplying the original slope 3/2 and the perpendicular slope -2/3 leads to -1
(3/2)*(-2/3) = -1
This is true for any pair of perpendicular lines, assuming neither line is vertical.
Choice A is the answer
Why? Because we start with 4, which is denoted a_1 = 4, and because we multiply each previous term by -3 to get the next term (which is what the second row of choice A says).