1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
PilotLPTM [1.2K]
3 years ago
14

Perform the operation. (-2x^2-4x+2)-(-6x+2) (−2x 2 −4x+2)−(−6x+2)

Mathematics
1 answer:
AleksandrR [38]3 years ago
4 0

Answer:

-50x^2+30x-4

Step-by-step explanation:

You might be interested in
Which equation in point-slope form that passes through the point (2, -3) and is parallel to a line passing through the points (1
Rzqust [24]
First, figure out its slope. that is (4-2)/(2-1)=2
then, write its point-slope form:
y-(-3)=2(x-2)
4 0
3 years ago
Graph each of the functions below
djverab [1.8K]
Vertex 3/2, 13/4 Opens down

Focus 3/2, 3

Axis x= 3/2

Directriz y= 7/2

I hope this helps.
5 0
3 years ago
If a elk can run 2,970 feet in 45 seconds. what is its top speed?
hichkok12 [17]
To describe its speed, divide 2970 by 45 to get 66 feet per second
5 0
4 years ago
A(n) ______ specifies the phenomena of interest; indicates which variables are independent, alternative, antecedent, intervening
Nana76 [90]

Answer:

An arrow diagram

Step-by-step explanation:

Helps keep track of intricate relationships between variables. Specifies the phenomena of interest: independent, alternative, antecedent and intervening.

-Time on the bottom with an arrow

-Antecedent -> Independent -> intervening-> dependent

An arrow diagram is defined as a process diagramming tool used to determine optimal sequence of events, and their inter-connectivity. It  is a network diagramming technique in which activities are represented by arrow, used for scheduling and to determine the critical path through nodes. The arrow diagramming method shows the required order of tasks in a project or process, the best schedule for the entire project, and potential scheduling and resource problems and their solutions. The arrow diagram lets you calculate the "critical path" of the project the flow of critical steps where delays can affect the timing of the entire project and where addition of resources can speed up the project.

One headed arrow connecting two variables= "X directly causes Y"

5 0
3 years ago
Read 2 more answers
45x - 18 factored i really need help
galina1969 [7]
45x - 18 factored I really need help
Can be rewritten as
9(5x--2)
8 0
3 years ago
Other questions:
  • Jamal has a pair of shoes that have a total mass of 960 grams and four identical books that have a total mass of 2 kilograms. Wh
    12·1 answer
  • Write an expression that is equal to 3×2 14 i was trying doin mixed number but 2 is the number on side 1 is numenator 3 denomani
    7·1 answer
  • WILL MARK BRAINLIEST The following table shows the data collected from 2 random samples of 100 students from an after-school clu
    9·2 answers
  • Use the substitution method to solve the system of equation.choose the correct ordered pair. 2x-y=10 2x-2y=4
    10·2 answers
  • <img src="https://tex.z-dn.net/?f=r%20%20%5Cfrac%7B8%7D%7B11%7D%20r%20%20%5Cfrac%7B10%7D%7B11%7D%20" id="TexFormula1" title="r
    7·1 answer
  • Solve for U. 4(3-U)+U= 22+2U
    8·1 answer
  • Help please I am getting confused to this problem
    8·2 answers
  • Please help ill gibe 20 points!!
    12·2 answers
  • 48 + 6m use the GCF to rewrite the expression​
    5·1 answer
  • Which angle is a vertical angle with ZEFD?
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!