Answer:
a) The mean is 
b) The standard deviation is 
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
The probability a student selected at random takes at least 55.50 minutes to complete the examination equals 0.6915.
This means that when X = 55.5, Z has a pvalue of 1 - 0.6915 = 0.3085. This means that when 
So




The probability a student selected at random takes no more than 71.52 minutes to complete the examination equals 0.8997.
This means that when X = 71.52, Z has a pvalue of 0.8997. This means that when 
So




Since we also have that 





Question
The mean is 
The standard deviation is 
Answer:
Speed of river's current = 5 mph
Step-by-step explanation:
Let 'd' be the distance covered
Let x be the speed of the rivers current
Speed upstream = 15-x
speed downstream = 15+x
Time = distance / speed
time upstream = 
time downstream = 
the ferry trip upstream takes twice as long as its return trip downstream
= 
divide both sides by d
= 
cross multiply


Add 2x on both sideds

subtract 15 from both sides and divide by 3

x=5
Speed of river's current = 5 mph
6w-10 represents the total amount of fence will need to complete the rectangle of fence in his yard. The fence will need two lengths and 2 widths to complete the rectangle. If the width is w, and the length is 2w-5, then the total for the rectangle would be w+w+2w-5+2w-5 which simplifies to 6w-10.
F(x)= -8x²
f(-3)= -8* (-3)²
f(-3)= -8 * 9
f(-3)= -72