Answer:
Knee joint.
Explanation:
The knee joint is a freely movable joint in the body. Usually allows a slight degree of movement.
The estimated expected (mean) time for project completion is 50 weeks, time management includes all the activities necessary to achieve the target date of delivery of the project. It includes the following activities: identification of activities, logical sequencing of activities, estimation of duration of activities, and preparation of the project schedule. For the preparation of the schedule we will see various methods such as resource leveling, simulation, and the critical chain method.
Answer:
READ TO THEM TELL THEM ABOUT FAMOUS AUTHORS
Explanation:
LET THEM NO THE GOOD THATS GOING TO COME OUT OF IT
Answer: The correct answer would be option a.
Explanation:
The hemoglobin in red blood cell has a tendency to bind to oxygen as well carbon dioxide in a reversible manner. It depends upon the partial pressure of the gas.
For example, at tissue site, the concentration of carbon dioxide is higher than oxygen due to which the affinity of hemoglobin increases for carbon dioxide.
In hemoglobin, carbon dioxide reacts with water to form bicarbonate ions and hydrogen ions.
At alveolar site, these ions again convert into carbon dioxide and excrete out of the blood as a part of exhale air.
The answer to your question is B- introduction of non-native animal species