To minimize the cost, we take the straight distance from the refinery to the other side of the river as 2 km. Also, the 7 km will be the distance that has to be traveled by the pipeline in land. The total cost, C, is therefore,
total cost = (2 km)($800,000/km) + (7 km)($400,000 /km)
total cost = $4,400,000
Thus, the total cost of the pipeline is approximately $4,400,000.00.
Answer: 36
Since the sum of the ratios is 5+7=12
the total number of students must be divisible by 12
The only number within the given range is 36
Answer:
$91/$15=x
Step-by-step explanation:
$100-$9=$91 and 91÷15= 6. omething which means only 6 pizza can be purchased.
The answer up above just says 91 divided by 15 gives you the amount of pizzas. He can only buy 6 pizzas with a pound remainding
Answer:
use Google
Step-by-step explanation:
n lhhxludlufnnhhxkxiyxxoyx
Answer:
70.4 meters
Step-by-step explanation:
A to B: 40²+10²=c² = 1600+100=c² = 1700=c² = c=√1700 = 41.23
B to C: 25²+15²=c² = 625+225=c² = 850=c² = c=√850 = 29.15
41.23+29.15=70.38