Answer:
Weight of copper: 62,000 lbs. (31 tons). Weight of framework: 250,000 lbs. (125 tons). Weight of concrete foundation: 54,000,000 lbs. Thickness of copper sheeting: 3/32 of an inch, the thickness of two pennies placed together. the answer in 125
Step-by-step explanation:
Answer:
d. m<ABD = 50°, m<GBC = 47°, m<EBC = 50°, and m<DBG = 83°
Step-by-step explanation:
m<ABF = 47° (given)
m<FBE = 83°
✍️m<ABD + m<ABF + m<FBE = 180° (angles on straight line)
m<ABD + 47° + 83° = 180° (substitution)
m<ABD + 130° = 180°
Subtract 130 from each side
m<ABD = 180° - 130°
✅m<ABD = 50°
✍️m<GBC = m<ABF (vertical angles)
✅m<GBC = 47° (Substitution)
✍️m<EBC = m<ABD (Vertical angles)
✅m<EBC = 50° (substitution)
✍️m<DBG = m<FBE (vertical angles)
✅m<DBG = 83° (Substitution)
13. 1
14. 1
15. any number and 0 will have a quotient of 0.
for example 7/0=0 . 8/0=0 . 9/0=0
if you try and check your work using multiplication 7*0=0 . 8*0=0 . 9*0=0
then you will realize the rule is right
Answer:
2.3%
Step-by-step explanation:
The formula to convert x into z distribution is

Where z is the test statistic
x is what we are looking for (in this case 37)
is the mean (in this case, it is 25)
is the standard deviation (we have 6)
<em>Plugging these into the formula, we get:</em>

Thus we can say we want 
<u>Note: </u> 
The table given is for any z where 
Thus, now we have:

0.0228 into percentage is 0.0228 * 100 = 2.28%
Rounded, we get 2.3%
Third answer choice is right.
Step-by-step explanation:
The sequence is as follows :
-59 ,-67 ,-65 ,-53 ,-31 ,...
The first term = -59
The second term = -67
Common difference = second term - first term

To calculate the second term add (-8).
To calculate each additional term, increase the amount added by -8.