Answer:
angle SRT = 180 -44 = 136 °
Step-by-step explanation:
mark me as brainliest ❤️
<h2>
Answer:</h2>
<em><u>The truck cannot pass safely under the bridge. The truck is 13 inches taller than the maximum height.</u></em>
<h2>
Step-by-step explanation:</h2>
In the question,
The maximum height of the vehicle which is capable of passing under the bridge is 12 feet and 5 inches.
So,
Now we know that,
1 feet = 12 inches
So,
12 feet = 12 x 12 = 144 inches
So,
Total height of the vehicle which is permissible to pass under the bridge is,
12 feet 5 inches = 144 + 5 = 149 inches
Also,
Height of the truck = 162 inches
Therefore, we can see that the permissible height is smaller than the height of the vehicle.
Height of vehicle which is more than permissible height is by,
162 - 149 = 13 inches
<em><u>Therefore, the truck cannot pass safely under the bridge. The truck is 13 inches taller than the maximum height.</u></em>
Answer:
-2.5
Step-by-step explanation:
Plugged into calculator
Answer:
16 units
Step-by-step explanation:
period = length of an interval that contains exactly one copy of the repeating pattern, so from one peak to another peak.
in this graph its the peaks are 1 and 17, hence the period is 16
Tom--------------
>10 sq ft per minute
Tim-------------------
>3.5*10=35 sq ft per minute
Both painters (10+35)=45
sq ft per minute
let's assume a cubic unit crate----------> V1=1*1*1=1 feet3
<span>the total surface of the cube is S1=6*(1*1)=6 </span>sq
ft
if the volume of the cube increases twice
V2=2 feet3 ------------------- > 2=x*x*x------------- >x=2^(1/3)
And the S2=6*(2^(1/3)*<span> 2</span>^(1/3)=9.5244 sq ft
V2/V1=9.5244/6=1.5874
Therefore
If Tim and Tom-----------------------
> take 1 day----------- > to paint a crate V1
For the crate V2------------- > take 1.5874 days
assuming an 8-hour work day
0.5874*8=4.70 hr-------------- > 4 h 42 min
The answer is 1 day 4h 42 min