Answer:
Computer programmers may advance as project leaders or software developers.
Answer:
feasibility study
Explanation:
In feasibility studies, the assessment of the practicality of a proposed project is made and the relevant factors of the project is usually being taken into account, which includes economic, technical, legal and scheduling considerations.
Various project managers use feasibility studies to know the pros and cons of getting involved in a project before they can embark on it.
Answer:
Click the Display tab
Explanation:
Choose the Word count option to make it visible, within the Display tab dropdown
Answer: 8.1 msec.
Explanation:
If we are told that we have a transmission link of sending 10 Mbits in one second, setting up a direct proportion, we can find out how much time is needed to send 4096 bits along the same channel, as follows:
10⁶ bits = 1 sec
4096 bits = x ⇒ x = 4096 bits. 1 sec / 10⁶ bits = 4.1 msec.
As we have 4 msec of latency between sender and the receiver, we need to add these 4 msec to the transit time, so we have a total message transmission time of 8.1 msec.