1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
bixtya [17]
3 years ago
10

Divide by 120000÷600​

Mathematics
2 answers:
umka21 [38]3 years ago
6 0

Answer:

200 is the answer

Step-by-step explanation:

good luck

Brilliant_brown [7]3 years ago
4 0

Answer:

120000/600

200 is your answer

You might be interested in
Solving a motion problem using a system of equations
kvasek [131]
Step 1 understand the problem make sure that you read the questions carefully several times Step 2 devise a plan Translate step 3 carry out the plan solve this is a system of linear equations with 3 variables
8 0
3 years ago
Joel can either work 2 days for 11 hours each day or 4 days for 6 hours each day. He takes the bus for $2.25 each way. On days h
Oxana [17]
Joel's work makes $9.50/ hr. During the 2 Day, 11 hrs shift, he earns a total of $217.55 but spends a cash of $9 on his bus. Therefore, the money left is $208.55. While on his 4 day, 6 hrs shift, he earns a total of $228 but spends $18, with a total money of $210. The option that he should take to make the most money is the 4 days for 6 hrs shift. 
7 0
3 years ago
What is 2 dollars to 40 cents as a fraction in lowest terms?
pav-90 [236]
It is 5/1
200/40
20/4
5/1
3 0
3 years ago
What’s the correct answer for this?
Alexxx [7]

Answer:

the answer is the top choice

3 0
3 years ago
The height of Mountain P is 1,086 feet.The height of Mountain Q is 4 times the height of Mountain P.The area model shown below r
earnstyle [38]

Answer:

A=4000, B=80, C=24

Step-by-step explanation:

You forgot to put the correct area model, I attached it to the answer.

We have the fact that Mountain Q is 4 times the height of Mountain P. That's the "4" we have in the left side of our model. It's like having a multiplication table, next to the "4" we have "A" and upper this we have "1000", the only thing we have to do is multiplify 4*1000=4000. The next letter we have is B and below it we have "320", we divided it by 4, 320/4=80. The last letter we have is C, and is below a "6", we only have to multiplify it by 4, 6*4=24.

At the end we only sum our

  • A + 320 + c = 4344 (4 times the height of Mountain P).
  • 1000 + B + 6 = 1086(the height of the Mountain P).

8 0
3 years ago
Other questions:
  • How did we get C part in this problem? Aren't we suppose to subtract 2000 by 4000 and then get the dependent variable and for th
    11·2 answers
  • Change 270.50° to degrees mins and seconds
    7·1 answer
  • I need help, WILL GIVE BRAINLIEST IF RIGHT. i need it in percents
    9·1 answer
  • When asked to compare -9 and positive 2 Joshua wrote -9 >2 Joshua correct? If not explain and correct his error
    11·1 answer
  • In this figure m∠A=(2x-2)°, m∠C=(4x-6)°,and m∠DBC=(5x+4)° What is m∠C
    9·2 answers
  • I dint understand this what’s the answer?
    11·1 answer
  • A metal rod will be cut into pieces that are each 1/20 meters long. The rod is 4/5 meters long. How many pieces will be made fro
    9·1 answer
  • Please answer asap don’t troll!!!
    7·1 answer
  • Write the coordinates of the vertices after a rotation of 90 degrees counterclockwise around the origin.
    5·1 answer
  • Find the linear regression equation for the transformed data. x=1,2,3,4,5 y=13,19,37,91,253 log y=1.114,1.279,1.568,1.959,2,403
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!