Multiply each hourly rate by x ( time to complete the work) add it to the service call for each and then set the equations equal:
50 + 40x = 30 +45x
Subtract 30 from both sides:
20 + 40x = 45x
Subtract 40x from both sides:
20 = 5x
Divide both sides by 5
x = 4
The length is 4 hours.
Answer:
80 maybe no ummm udk sorry I might
Step-by-step explanation:
I got you I think
Chin is correct because 5 x $.65 is $3.25., and he multiplied by US/GB
Nadene is incorrect because she took GB/US x 5
Answer:
Check photo
Step-by-step explanation:
For the first blank where it asks for the perimeter, the perimeter is all the outside sides of a shape added up. So, 6 + 1 + 2 + 4 + 4 + 5 = 22.
For the second blank, you just multiply the entire perimeter by 5, so, 22 times 5=110.
For the third blank, it is basically the same as the previous question. The answer is 5.
For the fourth blank, it is the same perimeter as the first blank, but instead of centimeters, it is in k. So, 22k.
Hope this helped! :)