For this case what you must do is add the number of hours to perform the different activities.
We have then:
14 person-hours of labor to break up to driveway and clear away the rubble.
8 person-hours of labor to pour and smooth concrete for the new driveway.
Adding both activities we have
14 + 8 = 22
answer
it takes to break up to driveway, clear away the rubble, pour the concrete, and smooth the concrete about 22 person-hours of labor
Answer:
not enough info
Step-by-step explanation:
Answer:
9
Step-by-step explanation:
<u><em>Definition of: Coefficient</em></u>
A number used to multiply a variable.
<u><em>Example:</em></u> 6z means 6 times z, and "z" is a variable, so 6 is a coefficient.
Variables with no number have a coefficient of 1.
<u><em>Example</em></u>: x is really 1x.
<em><u>coefficients:</u></em>
3<em>x⁴</em>+ 5<em>x²</em> + 1<em>x</em>
<u><em>sum of the coefficients:</em></u>
3 + 5 + 1
8 + 1
9
Answer:
The answer to your question is vo = 19.62 m/s
Step-by-step explanation:
Data
angle = α = 30°
time = t = 2 s
vo = ?
g = 9.81 m/s²
Formula

Solve for vo

Substitution

Simplification


Result
vo = 19.62 m/s
Answer:
2 batches of orange water = 6 tablespoon of yellow water and 2 tablespoon of red water
4 batches of orange water = 12 tablespoon of yellow water and 4 tablespoon of red water
Step-by-step explanation:
1 batch
Yellow water = 3 teaspoons
Red water = 1 teaspoons
Yellow water : Red water = 3 : 1
2 batches of orange water
Multiply the ratios by 2
Yellow water : Red water
= (3 : 1) * 2
= 6 : 2
2 batches of orange water = 6 tablespoon of yellow water and 2 tablespoon of red water
4 batches of orange water
Multiply the ratios by 4
Yellow water : Red water
= (3 : 1) * 4
= 12 : 4
4 batches of orange water = 12 tablespoon of yellow water and 4 tablespoon of red water