Answer:
$840
Step-by-step explanation:
4 weeks = 28 days
28 x 30 = 840
Answer:
1. $0.80 or 80 cents
2. 1.25 meters
Step-by-step explanation:
The equation p=0.8L represents the price p (in dollars) of a piece of nylon rope that is L meters long.
1. To find how much the nylon costs per meter, take L = 1 (this means you are calculating the price of a piece of nylon rope that is 1 meter long):

2. To find how long a piece of nylon rope that costs $1.00 is, substitute into the equation p = 1:

Answer: 1 - 2 = u got this
Step-by-step explanation:
Answer:
height of cylinder = 4/3 h
Step-by-step explanation:
The solid has a cylinder surmounted with a cone .Therefore, the volume of the solid is the sum of the cone and the cylinder.
volume of the solid = volume of cylinder + volume of cone
volume of the solid = πr²h + 1/3πr²h
let
height of the cylinder = H
recall
the height of the cone = 2h
volume of the solid = πr²h + 1/3πr²h
3(1/3πr²2h) = πr²H + 1/3πr²2h
2πr²h = πr²H + 2/3 πr²h
πr²(2h) = πr²(H + 2/3 h)
divide both sides by πr²
2h = H + 2/3 h
2h - 2/3h = H
H = 6h - 2h/3
H = 4/3 h
height of cylinder = 4/3 h