Answer:
(5,0)
Step-by-step explanation:
an x-intercept is where the line crosses the x-axis. in this case it crosses it multiple time so other possible answers could be (1,0) or (-1,0)
1000 + 1200m = 1500 + 1175m
1200m - 1175m = 1500 - 1000
25m = 500
m = 500/25
m = 20 <== they are the same at 20 months...they will both be 25,000
Answer:
132 tiles
Step-by-step explanation:
Each tile cost $4
The adhesive/grouting material costs $17.82.
If the contractor pays a total of $545.82
Let the number of tiles be represented as x
The equation is represented as:
$17.82 + $4 × x = $545.82
17.82 + 4x = 545.82
Collect like terms
4x = 545.82 - 17.82
4x = 528
Divide bother sides by 4
4x/4 = 528/4
x = 132
The number of ceramic tiles the contractor bought = 132 tiles
Answer: hahshejehdbddndb
Step-by-step explanation:
H is less than or equal to 35
Just simplify each side and solve for the variable.