Overhead application rate which is also known as overhead absorption rate on the basis on labor hours is the total budgeted overhead for 2019 which is $900,000 divided by the expected production of 90,000 labor hours for the year.
overhead application rate=$900,000/90,000=$10 per hour
This implies that for every one hour worked overhead cost of $10 would be added to the other costs incurred.
The correct option then is the third option of $10.00 per hour
Answer:
8
Step-by-step explanation:
Answer:
(f - g)(x) = 37 - x
Step-by-step explanation:
(f - g)(x) = (27 +3) - (x - 7)
= 27 + 3 - x + 7
= 37 - x
<h3>
Answer: x-2y = -8</h3>
===========================================
Explanation:
Multiply both sides by 2 to clear out the fraction
y = (1/2)x+4
2y = 2[ (1/2)x + 4 ]
2y = 2*(1/2)x + 2*4
2y = x + 8
Then move the x term over to the left side
2y = x+8
2y-x = 8
-x+2y = 8
Optionally we can multiply both sides by -1
-x+2y = 8
-1*(-x+2y) = -1*8
x-2y = -8
This is in standard form Ax+By = C with A = 1, B = -2, C = -8
The reason why I multiplied both sides by -1 was to make A > 0 which is what some textbooks use as convention. Of course -x+2y = 8 is equally valid too.