The answer that best completes the statement above is this: <span>signs, barricades, drums, cones, tubes, flashing arrow panels, and flag individuals. The main purpose of these traffic control devices is to signal the drivers to stop or to slow down and to change lanes most especially in areas that are undergoing construction.</span>
Answer:
The correct option to the following question is option (B). e-business.
Explanation:
E-business is stands for the Electronic business.
E-business is the business which is conduct by the uses of the internet, Web, extranet or intranet, etc.
E-business is also known as the online business where online transactions take place.
E-business facilitates our customers that the selling and the buying of the goods between the consumers and the merchants.
Answer and Explanation:
A TM with doubly infinite tape can simulate an ordinary TM. It marks the left-hand end of the input to detect and prevent the head from moving off of that end. To simulate the doubly infinite tape TM by an ordinary TM, we show how to simulate it with a 2-tape TM, which was already shown to be equivalent in power to an ordinary
TM. The first tape of the 2-tape TM is written with the input string, and the second tape is blank. We cut the tape of the doubly infinite tape TM into two parts, at the starting cell of the input string. The portion with the input string and all the blank spaces to its right appears on the first tape of the 2-tape TM. The portion to the left of the input string appears on the second tape, in reverse order.
Answer:
Step One - problem/opportunity identification (V)
Step Two - Analysis (III)
Step Three - Design (II)
Step Four - Development (I)
Step Five - Testing and Installation (IV)
Explanation:
In the field of software development, or systems engineering, SDLC which refers to software development cycle refers to a systematic way of building software applications, it shows unique stages with the outcome of each stage dependent on the previous, step has a unique task which range from the planning, analysis, development, testing and installation of the information system.