Answer:
(4,1)
Step-by-step explanation:
If you have any questions about the way I solved it, don't hesitate to ask me in the comments below :)
Answer: 2.2 meters
Step-by-step explanation:
The data is:
The initial piece is 6.35 meters long.
We cut 25 pieces of 16.2cm each, so in pieces only we have:
25*16.2cm = 405cm
1m = 100cm
Then: 405cm = (405/100) m = 4.05m
And each time that we cut a piece, we have 4mm of waste.
Then we have 25 times the 4mm of waste, this means that the total waste is:
4mm*25 = 100mm
and 1000mm = 1m
100mm = (100/1000) m = 0.1m
So the total amount that was cut is:
4.05m + 0.1m = 4.15m
The length in the channel iron will be: 6.35m - 4.15m = 2.2 meters
Step-by-step explanation:
=11/3×1/14
=3.67×0.07
=0.2568
What is the slope of the line segment XY?
For this one the answer is -2 so the answer is A.
Which of the following statements best describes the amount of water in the pool?
The answer is A
Hope this helps!
Answer:
x=11
Step-by-step explanation: