1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Lyrx [107]
3 years ago
14

There is a leaky faucet in a bathroom, and Joey places a bucket underneath the faucet. After 2/3 of an hour, 1/8 cup of water ha

s been collected in the bucket. At what rate, in cups per hour, is water leaking from the faucet?
A. 1/12
B. 3/16
C. 13/24
D. 19/24
—
please help-​
Mathematics
2 answers:
Evgen [1.6K]3 years ago
6 0

Answer:c

Step-by-step explanation:

i think

Nataliya [291]3 years ago
6 0

Answer:

B

Step-by-step explanation:

You have to divide the fractions and make the answer a reciprocal.

Hope this helps!

You might be interested in
Mr and mrs smith buy tickets for themselves and their four children. the cost of an adult ticket is ? 6 more than the adult tick
kirill115 [55]

Answer:

child's ticket =  4.75        adult ticket=10.75.

Step-by-step explanation:

The cost of an adult ticket is 6 more than that of a child ticket, so will be denoted by c+6. Now, we are told that the cost of four child tickets and two adult tickets is 40.50, so we can put this in an equation and solve for c:

(c+6)+(c+6)+c+c+c+c=40.50

6c+12=40.50

6c=28.50

c=4.75

Therefore the cost of a child's ticket (c) is 4.75 and the cost of an adult ticket (c+6) is 10.75.

4 0
3 years ago
| 7x28 = (748) + ( 7 *__) =
masya89 [10]

Answer:

-23

Step-by-step explanation:

i dont know

3 0
3 years ago
What is the slope of a line that is parallel to the x-axis? 0 1 undefined
Troyanec [42]
Its 0 because the slope would be one if it was a positive line and itd go up and across one unitl and it is undefined if it is parallel to the y axis
3 0
3 years ago
Read 2 more answers
Worker A finishes the job in 10 hours; worker B finishes it in 12 hours, and worker C finishes it in 15 hours.
nika2105 [10]
A=1/10, b=1/12, c=1/15  (these are the rates for each worker...)

1.)

2(1/10)+4(1/12)+t/15=1

1/5+1/3+t/15=1

(3+5+t)/15=1

3+5+t=15

8+t=15

t=7

So it would take c 7 hours to finish the job.

2.)

1/40-1/60

(3-2)/120

1/120

The drain rate is 1/60.  So you will need to find t when the tank is empty, while starting at 2/3 capacity...

2/3-t/60=0

(40-t)/60=0

40-t=0

t=40

It would take 40 minutes to empty the tank when it is 2/3 full.
5 0
4 years ago
Angelina and Neil are going to the movies today each movies bought a medium popcorn and Neil. Org small soft drink Angela had a
Drupady [299]

there are too many spelling incorrections for me to understand the question, sorry.

6 0
3 years ago
Read 2 more answers
Other questions:
  • It is an odd number.
    9·1 answer
  • A box is a cuboid with dimensions 28 cm by 15 cm by 20 cm all measured to the nearest centimetre. Dis cases are cuboid which mea
    5·1 answer
  • Can someone break this down for me!! I'm stuck
    12·1 answer
  • Convert 100 inches per minute to feet per hour?
    7·1 answer
  • Multiply 3x(2x-1) by following these steps
    8·2 answers
  • The equation 3x + 2 = 29 is modeled below.
    12·2 answers
  • There are 10 marbles in a bag 1/5 are and the other are blue .What is the ratio of red to blue marbles
    15·1 answer
  • Please help I will mark brainliest
    11·2 answers
  • I need help for this..
    12·1 answer
  • Help meeeeeeee!!! REEEE
    8·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!