a construction worker needs to pour a rectangular slab 23 ft long, 24 ft wide, and 8 in thick. how many cubic yards does the con struction worker need?
2 answers:
Answer:
13.63 cubic yards
Step-by-step explanation:
we are asked to find the volume of the slab in cubic yards, hence we have to be sure that all the lengths are expressed in yards first. We use the following conversions:
1 ft = 1/3 yard
1 in = 1/36 yard
Length = 23 ft = 23 x (1/3) = 23/3 yards
Width = 24 ft = 24 x (1/3) = 8 yards
thickness = 8 in = 8 x (1/36) = 8/36 = 2/9 yards
hence volume = Length x Width x Thickness
= (23/3) x 8 x (2/9)
= 13.63 cubic yards
Answer:
Step-by-step explanation:
I’m a sorry what are the choices?
You might be interested in
Answer:
m =
Step-by-step explanation:
Given
y = mx + b ( subtract b from both sides )
y - b = mx ( divide both sides by x )
= m
Answer:
Jasmine expected to get $150 for her bonus, but she only got $100. What was the percent error?
-----
Amt of error:: $50
----------
% error:: 50/150 = 1/3 = 33 1/3%
I say the answer is A, correct me if I'm wrong.
Eke grieve is edie she’s 13
Answer:
Try an Scientific Calculator You'll Get That In No time