D. the last answer choice
Answer:
C5
Step-by-step explanation: 10 x 2 = 20 so you add the 2 to the other one and get 4. Then half of 10 is 5 and half of 2 is 1, so add 1 to 4 and your answer is 5.
10x2= 20 +5= 25 Answer:5
Answer:
2 minutes
Step-by-step explanation:
The front of the train enters the tunnel and travels 1 km before the rear of the train enters the tunnel. Thus, the total distance traveled by the front of the train is 2 km, and this is covered in a certain number of hours:
Since distance = rate times time, time = distance / rate. In this particular case we have:
2 km
time = distance / rate = ------------------- = (1/30) hr
60 km/hr
(1/30) hr converts to 2 minutes, since 1 hr = 60 minutes
Answer:
The minimum sample size needed is
. If n is a decimal number, it is rounded up to the next integer.
is the standard deviation of the population.
Step-by-step explanation:
We have that to find our
level, that is the subtraction of 1 by the confidence interval divided by 2. So:

Now, we have to find z in the Z-table as such z has a p-value of
.
That is z with a pvalue of
, so Z = 1.645.
Now, find the margin of error M as such

In which
is the standard deviation of the population and n is the size of the sample.
How large a sample must she select if she desires to be 90% confident that her estimate is within 4 ounces of the true mean?
A sample of n is needed, and n is found when M = 4. So






The minimum sample size needed is
. If n is a decimal number, it is rounded up to the next integer.
is the standard deviation of the population.
Step-by-step explanation:
Set-builder notation is a notation for describing a set by indicating the properties that its members must satisfy.
C={2,4,6,8}
C={2×1,2×2,2×3,2×4}
thus set builder form is:
{x:x=2n,n∈N} and this set is also call even number set in description mathod